Small town or big city - Dare to dream big.

Project Type: Library Renovation & Expansion

Brandon, Wisconsin | Population: 880

Our Services Provided
Planning & Feasibility Study + Capital Campaign

Campaign Highlights

  • Campaign Goal: $500,000

  • Total Project Cost: $1.2 Million

  • Campaign Duration: 15 Months

  • Outcome: Fully Funded Project + Renovation Completed

The Opportunity

The Brandon Public Library, originally built in 1897, had long served the community - but the space could no longer meet modern needs.

The facility was small, outdated, and limited in its ability to support programming, technology, and community gatherings.

At the same time, the community had a strong attachment to the library and a clear desire to preserve its presence on Main Street.

The goal was simple - but not easy: expand and modernize the library while maintaining its historic character and community identity.


Our Approach

Keys to Success

Baker Street Consulting Group conducted a planning and feasibility study, then partnered with the library and a volunteer-led campaign committee to design and execute a capital campaign.

We worked closely with local leadership to:

  • Develop a clear and achievable campaign plan

  • Equip volunteers with tools and confidence to lead

  • Create messaging that resonated with the community

  • Provide ongoing coaching to maintain momentum

The campaign was intentionally built to be community-driven - reflecting Brandon’s size, relationships, and strengths.


  • Strong local leadership and volunteer ownership

  • Early momentum through key gifts and challenge grants

  • Broad participation from individuals, families, and businesses

  • A shared belief in keeping the library at the heart of the community

  • Persistence through challenges, including pandemic delays and rising costs


The Results

Brandon’s library expansion stands as a clear reminder: even the smallest communities can accomplish big things when people come together around a shared vision.

  • $500,000 raised toward a $1.2 million project: creative solutions are the key to success!

  • Fully funded renovation and expansion project

  • Strong participation across the entire community

  • High visibility and sustained momentum throughout the campaign

The New Library (read all about it)

  • Expanded from 1,334 sq. ft. to 2,784 sq. ft.

  • New meeting room, reading areas, and workspaces

  • Improved technology and programming capacity

  • ADA-compliant design with accessible restrooms

  • Seamless integration of historic structure with new space

  • Renewed community pride and engagement

  • A stronger, more functional gathering space for residents

  • Continued role as a central hub for learning, connection, and local life